150MW BURGOS WIND FARM EDC Wind Power Corporation A timelapse documentation prepared for Energy Development Corporation (EDC). However, this presentation represents the author's own edit. It is not the approved version of EDC. Featuring 50 units of Vestas V90 3MW wind turbines. Commissioned last November 5, 2014. The estimated cost for the construction of the wind farm was US$450 million. Coverage commenced from the arrival of turbine components last October 2013, with the blades, nacelles and tower segments arriving at Omnico Port, Ilocos Norte. These parts were later transferred to Burgos through barging. Significant stages of the construction were covered: from Foundation Preparation up to Tower Erection. Hundreds of thousand still shots taken using CANON 5D Mark3 with various Canon lenses. It also utilized a proprietary Long-Term Timelapse set with a camera in a metal enclosure shooting continuously at location. Music credit: Audiomachine. Watch in 720p HD and with sounds turned loud. All rights reserved. Please do not use or copy without the author's permission. bongbajo@yahoo.com