Falls International Airport Runway Reconstruction Phase 3: Runway Reconstruction

submitted by Alex Kline on 08/17/22 1

The Falls International Airport Runway Reconstruction is a multi-year, multi-phase infrastructure renewal project. In this video, SEH Airport Planning and Design Engineer Chelsea Kuchta gives an inside look at the 5,500 ft. runway reconstruction, grading, milling and more. Find our previous videos on the expansive project below, including detailed looks with commentary at various phases. 1. Falls International Airport terminal design – fall 2019 youtu.be/vji1tXYh3io 2. Inside look at runway paving – fall 2020 youtu.be/RLo5XSQpey4  3. Taxiway construction – summer 2020 youtu.be/w7Ro6ETI-5k  Get the full project story on what led up to this unique project: www.sehinc.com/portfolio/falls-international-airport-triggering-event-master-plan

Leave a comment

Be the first to comment

Collections with this video
Email
Message
×
Embed video on a website or blog
Width
px
Height
px
×
Join Huzzaz
Start collecting all your favorite videos
×
Log in
Join Huzzaz

facebook login
×
Retrieve username and password
Name
Enter your email address to retrieve your username and password
(Check your spam folder if you don't find it in your inbox)

×